Opening Hours:
Mon-Fri 8am-5pm
Send us mail
info@matrixme.ae
Phone Number
+971 2 6341575

Projects

CONTRACTYEARCLIENTSTATUS
CALL-OUT CONTRACT FOR 2023-2027 ASR GAS WELLS TIE-INS - PACKAGE 32023ADNOC ONSHOREIN PROGRESS
ADNOC CONTRACT NO. 17560.01, CALL OUT CONTRACT FOR ASR GAS TIE-INS IN BAB - PACKAGE 2​2020ADNOC ONSHORECOMPLETED
ADNOC CONTRACT NO.15681.01 Variation order for New RMS-7 Facilities ( Buhasa)2018ADNOC COMPLETED
ADNOC CONTRACT NO. 15919.01, INSTRUMENTATION & MECHANICAL MODIFICATION WORKS AT BAB & ASAB2016ADNOC COMPLETED
ADNOC DISTRIBUTION SERVICE WORK ORDER - AGREEMENT NO. EPD-WA-15002 INSTALLATION OF HV SWITCH IN THE 33KV OVERHEAD LINE FEEDING PERMANENT POWER TO AL HERAIMAH SERVICE STATION IN WESTER REGION2014ADNOCCOMPLETED
AL HOSN GAS AGREEMENT NO. AHG/2014.056/CT, MAINTENANCE OF OVERHEAD TRANSMISSION LINES AND ASSOCIATED UNDERGROUND CABLES2014AL HOSN GASCOMPLETED
ADCO CONTRACT No. 15681.01 REPLACEMENT OF POWER SKIDS FOR CLUSTERS 40-45 AT BUHASA2014ADCOCOMPLETED
SAIPEM CONTRACT NO. 821938, REROUTING OF ADCO 8” WATER INJECTION PIPELINE2013SAIPEMCOMPLETED
NPCC PROJECT NO. 9055, SUBCONTRACT No. PRJ-SEC-2012-899-A 12 NUMBERS WASH WATER WELLS, ELECTRICAL WORK UPSTREAM OF DISTRIBUTION BOARD2012NPCCCOMPLETED
CONTRACT No. 15323.01/EC 10809 ENGINEERING, PROCUREMENT AND CONSTRUCTION FOR BATCH – 1 PLANT MODIFICATIONS AT BU HASA2012ADCOCOMPLETED
CONTRACT No. 15410.01/EC 10825
AL DABBIYA PHASE-1 ADDITIONAL INJECTION WELLS TIE-INS
2012ADCOCOMPLETED
AJES LPO No. ES/OP/12000689 – EPC WORKS FOR RELOCATING 11KV EXISTING OHL LINE - RUWAIS SULPHUR HANDLING PROJECT2012GASCOCOMPLETED
ADCO MWO 92227884 – REMOVAL OF VAPOR RECOVERY COMPRESSOR # 1 AT DY-CPP 2011ADCOCOMPLETED
CONSTRUCTION OF 33KV WOODEN POLE OVERHEAD LINE WORKS FOR ADCO BAB THAMAMA PROJECT IN HABSHAN2011L&TCOMPLETED
CONTRACT NO. 15169.01/ EC10785 SUPPLY AND CONSTRUCTION OF 33KV OHL FOR OIL WELLS BB-551, BB-587, BB-593, BB-429 AND BB-267 FOR BAB FIELD2011ADCOCOMPLETED
CONTRACT NO. 7427.01/EC 20586 INSTALLATION OF CHEMICAL INJECTION PACKAGE FOR THE GAS LIFT PILOT PROJECT AT BU HASA2010ADCOCOMPLETED
CONTRACT NO. 7175.01/EC 10724 DISPOSAL OF WATER SYSTEM DE-BOTTLENECKING AND TIE-IN OF 2 NUMBER WATER DISPOSAL WELLS AT BAB2010ADCOCOMPLETED
CONTRACT NO. 7157.01 SUPPLY, FABRICATION, INSTALLATION AND TIE-INS OF SB-6 NEW SHALLOW WATER WELLS AT ASAB 2010ADCOCOMPLETED
MINOR WORK ORDER - ADDITIONAL WORKS FOR SEAL GAS CONDITIONING UNIT FOR DRESSER RAND COMPRESSOR (TRAIN II)2010ADCOCOMPLETED
CONTRACT NO. 7470.01/EC 10750
CONSTRUCTION WORKS FOR NEB TIE-INS AND CLUSTER MODIFICATIONS
2010ADCOCOMPLETED
CONTRACT NO. 7459.01/EC 10748 - CONSTRUCTION WORKS FOR TWELVE GAS PRODUCER TIE-INS AND FLOW LINES SEGREGATION FOR UNITS 6 & 7 WELLS AT BAB2010ADCOCOMPLETED
ADCO CONTRACT NO. 7489.01/EC 10752 - CONSTRUCTION FOR ENHANCEMENT OF CORROSION INHIBITION INJECTION AT ASR GAS PRODUCTION WELLS AT BAB2009ADCOCOMPLETED
INSTALLATION OF CONDITIONING SKID AT ADCO, BU HASA2009ADCOCOMPLETED
AJES WORK SERVICE ORDER NO. 01/MHO/2450/09 - HABSHAN-5 EARLY WORKS - SUBCONTRACT WORKS REROUTING OF 33 KV OVERHEAD LINE2009ADCOCOMPLETED
TRANSCO CONTRACT NO. N-4381 B
AL AIN WATER TRANSMISSION SCHEME (AWTS) PIPELINE FROM AL HAYER TANKS COMPOUND TO JUNCTION A IP 131 AREA AT AL AIN (LOT P2) AND PIPELINE FROM ZAKHER PUMPING STATION TO MEZYAD (LOT P3)
2008TRANSCOCOMPLETED
ADCO CONTRACT NO. 6968.01/EC 10693
EPC WORKS FOR REPLACEMENT OF 11KV RING MAIN SYSTEM SUB-STATIONS & ALTERNATIVE POWER SUPPLIES AT BU HASA
2008ADCOCOMPLETED
AGREEMENT No. 07ARTSA 10422 REPLACEMENT OF CAUSTIC INJECTION SKID IN UUNIT13 AT ABU DHABI REFINERY2008TAKREERCOMPLETED
ADCO BU HASA - TEMPORARY SEAL GAS SUPPLY LINE TO D-R COMPRESSORS 2008ADCOCOMPLETED
ADMA-OPCO CONTRACT No. 97661, UPGRADE OF 415V VENT FAN MCC AT USSC2007ADMA-OPCOCOMPLETED
ADCO MWO No. 37787 CONSTRUCTION OF 33KV OVERHEAD LINES FOR BAB ARTIFICIAL LIFT WELLS No. 537 & 4522007ADCOCOMPLETED
AGREEMETN NO. 07RREDR 10378, FLOW METERS ON FLARE SUB-HEADERS OF HSK/HCK/CONDENSATE UNITS AT RUWAIS REFINERY2007TAKREERCOMPLETED
ADWEA CONTRACT NO. G4204 - AMPLIGHT EXPANSION PROJECT FOR ADDC & AADC2007ADWEACOMPLETED
ADWEA CONTRACT NO. G3923 - SUPPLY AND INSTALLATIONOF THE AUTOMATED METER READING (AMR)TECHNOLOGY SSYTEM IN ABU DHABI & AL AIN AREA2007ADWEACOMPLETED
ADCO CONTRACT NO. 6828.01/EC 10682 - CONSTRUCTION WORKS FOR ASAB OIL FACILITIES MODIFCATION 2006ADCOCOMPLETED
ADCO CONTRACT NO. 6598.01/EC 10634
CONSTRUCTION WORKS FOR INSTALLATION OF SOUTH BU HASA GAS LIFT PILOT & WAG PILOT PROJECTS
2006ADCOCOMPLETED
ADCO MWO 30227 - MISCELLANEOUS CIVIL WORKS IN RUMAITHA - WELL CELLAR GRATINGS2006ADCOCOMPLETED
AADC CONTRACT NO. A-2602 - SUPPLY, INSTALLATION & COMMISSIONING OF EARTH FAULT INDICATORS ON 11KV UNDERGROUND SYSTEM2005AADCCOMPLETED
ADCO CONTRACT NO. 6417.01/EC 10582
CONSTRUCTION WORKS FOR INSTALLATION OF HUWAILA FIELD DEVELOPMENT
2005ADCOCOMPLETED
CONTRACT No. D5391
SUPPLY AND INSTALLATION OF WATER METERS IN ABU DHABI REGION LOT A & B
2005ADWEACOMPLETED
ADWEA CONTRACT NO. G2418
RETROFITTING WORKS IN ABU DHABI & AL AIN FOR POWER DISTRIBUTION STATIONS
2005ADWEACOMPLETED
ADDC CONTRACT NO. D-4897/1 - EXPANSION OF ELECTRICAL NETWORK TO FEED POWER SUPPLY TO AL GHAZLAN ISLAND2005ADDCCOMPLETED
ADCO CONTRACT NO. 6649.01/EC 10649 - TEMPORARY POWER SUPPLY FOR BU HASA UNIT "G" AND "F" + "D" DEVELOPMENT PROJECT2005ADCOCOMPLETED
ADCO - THAMAMA C, F UNITS 6 & 7 GAS WELLS TIE-IN PROJECT- ADCO CONTRACT NO. 6312, NPCC PROJECT NO. 3092 SUBCONTRACT E.200/3092/2004/1258/A2005ADCOCOMPLETED
CONTRACT NO. CS/078/12/04-MD/B - INSTALLATION OF FLOW METER AT LPG PLANT MUSSFAH (ADNOC DISTRIBUTION2004ADNOCCOMPLETED
CONTRACT No. 6428.01/EC 10585 – FABRICATION & INSTALLATION OF 10 NOS. MANIFOLD APPROACHES AT SAHIL 2004ADCOCOMPLETED
CONTRACT NO. 3000005185, JOB 661000 - BU HASA FACILITIES DEVELOPMENT PROJECT, O/H POWER LINES – ADCO 2004ADCOCOMPLETED
MWO 21712 - RELOCATION OF WATER INJECTION FACILITIES2004ADCOCOMPLETED
D 3844 - POWER SUPPLY TO DOMESTIC ANIMALS FARM AT AL SEDERA AND NEW STABLES OF SHK. SULTAN FARM AT WARSAN 2004ADDCCOMPLETED
CONTRACT 6248.01/EC 10557 - CONSTRUCTION WORKS FOR TIE-IN OF BU HASA SINGLE GAS INJECTORS BU-511, BU-512 & BU-5142004ADCOCOMPLETED
D 3319 - INSTALLATION WORK FOR ELECTRICAL NETWORK REINFORCEMENT AND REHABILITATION IN ABU DHABI CITY (WEST ZONE)2004ADDCCOMPLETED
D-3467 - PROVISION OF REPLACEMENT OF LIGHTING NETWORK AT SEA PALACE2004ADDCCOMPLETED
54H/2003 - SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 33KV POWER SUPPLY SYSTEM FOR ETISALAT SITES2004ETISALATCOMPLETED
MWO 19425 - FABRICATION AND INSTALLATION OF 5 SLOTS TO ASAB CDS MANIFOLD2003ADCOCOMPLETED
ORDER N. 14493, JOB SNAMPROGETTI N. 661000 - ADCO – BU HASA FACILITIES DEVELOPMENT PROJECT 2003ADCOCOMPLETED
33 KV OVERHEAD LINE - BAB FIELD PRODUCTION FACILITIES EXPANSION PROJECT, HABSHAN2003ADCOCOMPLETED
CONTRACT 6242.01/EC 30039 INSTALLATION OF WELLHEAD CONTROL PANELS2003ADCOCOMPLETED
REF. CS/020/02/03-OPR/A - INSTALLATION OF FLOW METER AT LPG PLANT – MUSSAFAH2003ADNOC COMPLETED
CONTRACT 6069.01/EC 30046 CONVERSION OF GAS INJECTOR BU-450 TO WAG WELL2002ADCOCOMPLETED
CONTRACT 5921.01/EC 10518 - CONST. WORK FOR THE RELOCATION OF W I POWER LINES 3,5&6 THROUGH BUFFER TRANSFORMERS AT ASAB2002ADCOCOMPLETED
ADWEA CONTRACT G1191 - SEIH GHARABA WELL WATER TRANSMISSION SCHEME2002ADWEACOMPLETED
CONTRACT 5884.01/EC 10512 CONSTRUCTION OF SAHIL WATER INJECTION ENHANCEMENT PROJECT 2002ADCOCOMPLETED
CONTRACT 5965.01/EC 30022 INSTALLATION OF WELLHEAD CONTROL PANELS2002ADCOCOMPLETED
ADWEA CONTRACT G1176 - AL YAIF WELL WATER TRANSMISSION SCHEME2002ADWEACOMPLETED
AGREEMENT 53.01.011 ‘A’ POTABLE WATER BOOSTER PUMPS & CHLORINE INJECTION FACILITY2002TAKREERCOMPLETED
CONTRACT 5857.01/EC 30017 SUPPLY AND INSTALLATION OF FIRE PROOFING TO CRITICAL ACTUATORS 2001ADCOCOMPLETED
CONTRACT 5778.01/EC 10508 CONSTRUCTION WORKS FOR MPP TRIAL AT HUWAILA HU 44 WELL2001ADCOCOMPLETED
CONTRACT 5809.01/EC 30009 INSTALLATION OF BIOCIDE SKID AT HABSHAN2001ADCOCOMPLETED
CONTRACT 5822.01/EC 30010 SUPPLY AND INST. OF CHEMICAL INJECTION SKIDS FOR BU HASA ARTIFICIAL LIFT PROJECT / HUWAILA HU-44 MULTI PHASE PUMP TRIAL2001ADCOCOMPLETED
CONTRACT No. D-01-0048 INSTALLATION WORKS FOR LV & II KV CABLES AT SHK. ZAYED HORSE STABLE AT SWEIHAN AREA AND SHK. SULTAN FARM AT AL WARSON AREA2001ADWEACOMPLETED
CONTRACT 5324.01/EC 10498 PROCUREMENT, FAB. & DELIVERY OF NEW CHEMICAL INJECTION PACKAGE FOR ASAB CDS2001ADCOCOMPLETED
CONTRACT 5764.01/EC/ 30004 CONSTRUCTION WORKS FOR BU HASA ARTIFICIAL LIFT 2000ADCOCOMPLETED
MWO NO. A 20466 - 33 KV OVERHEAD LINES FOR BU HASA ARTIFICIAL LIFT PROJECT 2000ADCOCOMPLETED
REPLACEMENT OF GATE VALVES WITH DOUBLE BLOCK & BLEED VALVES & PIPE MODIFICATION AT ADIA AVIATION DEPOT2000ADNOC COMPLETED
SUPPLY OF POWER SKIDS FOR BU HASA ARTIFICIAL LIFT PROJECT2000ADCOCOMPLETED
DESIGN & BUILD FOUNDATIONS FOR THE POWER SKID AT AL DABB’IYA 1999ADCOCOMPLETED
AL DABB’IYA PILOT WATER INJECTION SYSTEM1999ADCOCOMPLETED
WATER DISTRIBUTION SYSTEMS FOR AREAS OF AL OHA, RAMLAR AL RAEE AND AL FAQA AT AL AIN 1999ADWEACOMPLETED
REHABILITATION OF FIRE ALARM SYSTEM AT JABEL DHANNA TERMINAL1999ADCOCOMPLETED
CONSTRUCTION WORKS FOR BACK PRESSURE CONTROL SYSTEM FOR NEW FST AT CDS-4, BU HASA 1999ADCOCOMPLETED
SHAH INFILL WELLS PROJECT1999ADCOCOMPLETED
LAYING OF ELECTRIC POWER CABLE FEEDING ADNOC HQ1999ADNOCCOMPLETED
INTERCHANGING OF BRINE HEATERS (E1 & E3)1999ADNOCCOMPLETED
WATER SUPPLY TO AL MAQUAM PALACE1998ADWEACOMPLETED
BAB, ASAB 132KV INTERCONNECTOR (SUB-STATION) 33 KV OHL1998ADCOCOMPLETED
INSTALLATION OF ADDITIONAL CHEMICAL INJECTION FACILITIES AT BCDS1998ADCOCOMPLETED
UPGRADING SWITCHGEAR ROOMS AT BAB, BU HASA, & SAHIL W.I. CLUSTERS1998ADCOCOMPLETED
REPLACEMENT OF 8” (BY INSTALLATION 6”) CRUDE OIL PIPELINE TO WED AT UAN1998ADNOCCOMPLETED
IRRIGATION PUMP STATION AT EXISTING RESERVOIRS 3 & 4 (SPC)1997SPCCOMPLETED
RECOVERY OF HYDROCARBONS FROM FEED GAS FILTER SEPARATOR1997ADNOCCOMPLETED
TAWEELAH POWER & DESALINATION PLANT1996WEDCOMPLETED
HOTEL AT AL MIRFA1995PWD COMPLETED
NEW R.O. UNIT FOR BU HASA WATER DESALINATION1995ADCOCOMPLETED
33 KV OHL FOR HU 44 & BU HASA WATER INJECTION1995ADCOCOMPLETED
REPLACEMENT OF BRINE HEATER, MULTI CYCLONE VESSEL AND SEPARATOR DISTRIBUTOR U.A.N1995ADNOCCOMPLETED
PERMANENT DEWATERING SYSTEM AT RUWAIS HOUSING COMPLEX.1995ADNOCCOMPLETED
RUWAIS FRACTIONATION PLANT DEBOTTLENECKING1995GASCOCOMPLETED
MAJLIS FOR H.H. SH. SULTAN BIN ZAYED AL NAHYAN1995PWD COMPLETED
CONTRACT 414A. KHALIFA TOWN A SEWAGE WORKS 1995SPCCOMPLETED
CONSTRUCTION OF BASE OIL STORAGE TANKS & PIPING AT LUBE OIL PLANT UM AL NAR1995ADNOC FODCOMPLETED
CONSTRUCTION OF BASE OIL STORAGE TANKS & PIPING AT LUBE OIL PLANT UM AL NAR
INSTALLATION OF DYPHIL LINE AT CHLORINE PLANT
1995ADNOCCOMPLETED
SUPPLY AND INSTALL GENERATORS & PUMPS 1994ABU DHABI MINICIPALITYCOMPLETED
RELOCATION OF HIGH PRESSURE SEAL OIL PUMPS1994ADNOCCOMPLETED
INSTALLATION OF WELLHEAD PANELS1994ADCOCOMPLETED
SUPPLY AND INSTALL OVERHEAD LINES AND EQUIPMENT 1994WEDCOMPLETED
ZUBBAYA/RUMITHA EARLY PRODUCTIONS GAS STATIONS 1994 ADCO COMPLETE1994ADCOCOMPLETED
HAZOP PACKAGE “B“ IMPLEMENTATION 1993/4ADCOCOMPLETED
BAB OIL DEVELOPMENT1993ADCOCOMPLETED
PORT ZAYED COLD STORES 1993PORT ZAYED SEA PORT AUTHORITYCOMPLETED
INSTALLATION OF AIR COMPRESSOR FOR CHLORINE INDUSTRIES 1993ADNOCCOMPLETED
REVERSE OSMOSIS UNITS AND HT POWER SUPPLY AT HABSHAN1993ADCOCOMPLETED
DRAIN RELIEF AND BURN PIT AT HABSHAN AND SHAMES1992ADCOCOMPLETED
JARN YAPHOUR DEVELOPMENT1992ADNOCCOMPLETED
M 23A ALAIN MAIN DRAINAGE1992AL AIN MUNICIPALITYCOMPLETED
REPLACEMENT OF 11 KV CABLES FOR GTAU 1-2-5 AT ASAB1992ADCOCOMPLETED
SCADA PROJECT ASAB 1992ADCOCOMPLETED
H.H.RUWAIS VILLA MODIFICATIONS AND EXTENSIONS 1992H.H.SHIEKH KHALIFA PRIVATE DEPTCOMPLETED
REPLACEMENT OF 11 KV CABLES1992ADCOCOMPLETED
H.H. AL AIN COMPLEX NEW ANCILLARY BUILDINGS 1992H.H. PRIVATE MANAGEMENTCOMPLETED
FIRE PROOFING OF ACTUATORS IN ALL AREAS 1992ADCOCOMPLETED
REPLACEMENT OF MOV ACTUATORS AT JEBEL DHANNA1992ADCOCOMPLETED
AUTO FIRE PROTECTION IDN SYSTEM DAS ISLAND1991ADGASCOMPLETED
H.H.UM GHAFA VILLA EXTENSION1991H.H. PRIVATE MANAGEMENTCOMPLETED
INSTALLATION OF FLOW ANALYSERS ON THE ASAB WATER INJECTION SYSTEM1991ADCOCOMPLETED
UPGRADING OF DRINKING WATER SYSTEM1990ADNOCCOMPLETED
AVIATION FUEL DEPOT AT AL AIN AIRPORT1990ADNOC FODCOMPLETED
AL KHAZNA AREA DRAINAGE. MI9 C/D 1990AL AIN MUNICIPALITYCOMPLETED
SAFETY HAND REAILS AT UMM AL NAR REFINERY1990ADNOCCOMPLETED
MAINTENANCE OF FILLING STATIONS1989ADNOC FODCOMPLETED
SEWAGE PUMP STATION 1989ABU DHABI MUNICIPALITYCOMPLETED
ASAB 33 KV OVERHEAD LINES1989ADCOCOMPLETED
SOLAR POWER SYSTEM FOR THAMMAMA “C“ REMEDIAL PROJECT1989ADCOCOMPLETED
G.H.Q. AREA LABORATORY1988ADDFCOMPLETED
REPLACEMENT OF CABLES TRAYS AT UMM AL NAR REFINERY 1988ADNOCCOMPLETED
RENOVATION OF PLANT AT ABU DHABI POWER STATION1988WEDCOMPLETED
ALAIN MAJLIS1988DIWAN OF H.H. SHEIK KHALIFACOMPLETED
REINSTATEMENT OF ELECTRICAL SYSTEMS AT THE MERIDIEN HOTEL 1988ABU DHABI NATIONAL HOTELS COMPANYCOMPLETED
SUPPLY AND ERECT 33 KV BYPASS CABLE AT RUWAIS1988ADNOCCOMPLETED
CONNECTION OF POWER SUPPLY TO TV STATION AT HABSHAN1987ADCOCOMPLETED
REFURBISHMENT OF ADCO 11 KV SWITCHGEAR1987ADCOCOMPLETED
33 KV OVERHEAD BETWEEN THAMMAMA “C“ ADCO AND GASCO1987ADCOCOMPLETED
11 KV OVERHEAD LINE INTERCONNECTION THAMMAMA “C” BAB1986ADCOCOMPLETED
EC-731 WATER SUPPLY TO BIDA HAZA & AL HAMRA CAMPS1986ADDFCOMPLETED
BU HASA WATER INJECTION PROJECT ELECTRICAL WORKS1986ADCOCOMPLETED
EC-714 AL DHAFRA AIR BASE ELECTRICAL WORKS1986ADDFCOMPLETED
BU HASA WATER INJECTION REFURBISHMENT OF 33KV POWER SKIDS1986ADCOCOMPLETED
REPAIRS TO PRODUCT STORAGE TANK AT UMM AL NAR1986ADNOCCOMPLETED
MODIFICATION TO EQUIPMENT IN PROPOSED ZONE 11 AREA DAS ISLAND1985ADMA-OPCOCOMPLETED
ASAB OIL GATHERING SYSTEM1985ADCOCOMPLETED
INSTALLATION OF METERING SKIDS 1985ADNOCCOMPLETED
MODIFICATION AND EXTENSIONS TO THE ABU DHABI POWER STATION1984/5WEDCOMPLETED
RUWAIS HYDROCRAKING PROJECT PLANT EARTHING1983ADNOCCOMPLETED
RUWAIS HYDRO CRACKING PROJECT STRUCTURAL STEEL ERECTION1983ADNOCCOMPLETED
RUWAIS HYDROCRACKING CATHODIC PROTECTION1983ADNOCCOMPLETED
RUWAIS HYDRO CRACKING PROJECT PIPE FABRICATION AND INSTALLATION1983ADNOCCOMPLETED
PENTANE PLUS PIPELINE PROJECT1983ADNOCCOMPLETED
THAMMAMA “C” GAS PROJECT UNDER GROUND PIPING1982ADNOCCOMPLETED
THAMMAMA “C” GAS MAIN PIPE RACK AND MAIN PIPE RACK AND
PORTAL FRAME BUILDING ERECTION
1982ADNOCCOMPLETED
THAMMAMA “C” GAS PROJECT TEMPORARY POWER1982ADNOCCOMPLETED
STRUCTURAL STEEL FOR CENTRAL BEVERAGE STORE1982ADMA-OPCOCOMPLETED
11 KV DISTRIBUTION SYSTEM1982ADNOCCOMPLETED
FIRE ALARM AND EMERGENCY TELEPHONE SYSTEM1981ADNOCCOMPLETED
LNG/LPG STORAGE1981ADNOCCOMPLETED
AL AIN FUEL DEPOT1981ADNOCCOMPLETED
WATER SUPPLY SYSTEM OLD SWEIHAN CAMP1981ADDFCOMPLETED
EXTERNAL WORKS FOR STATE MAJLIS 1981H.H.SHIEKH KHALIFA PRIVATE DEPTCOMPLETED
ZADCO TRAINING CENTRE 1980ZAKUM DEVELOPMENT COMPANYCOMPLETED
Portfolio

Recent Projects

Our Case Study

Rosalina D.
|
$56,000

Rosali Office Design

Azizul Haque
|
$86,000

Mirlando Construction

Salman Khan
|
$93,000

Pink Office Decoration

Rosalina D.
|
$37,000

Helix X. Building Make

Rosalina D.
|
$96,000

Best Office Design

Salman Ahmed
|
$66,000

Construction Building

Rosalina D.
|
$56,000

Building Office

Rosalina D.
|
$110,000

Buld IT Complex